• PRA Offer graphic
  • PAGES

  • CATEGORY SEARCH

  • ARCHIVES

San Pedro Waterfront Plans

Proposed changes to the waterfront. Click image to enlarge.

Proposed changes to the waterfront. Click image to enlarge.


The Port of Los Angeles has released a Draft Environmental Impact Report (DEIR) on their plans for the San Pedro waterfront which affects all Palisades residents. To view the DEIR please visit the Port of L.A. website. The Port would not include the Community Coalition’s Sustainability Plan (published in Random Lengths) as an alternative project. Instead, there are three Alternative Projects with the cruise ship terminal at Kaiser Point (across from inner Cabrillo Beach) and two Alternative Projects that are effectively no project.

The Port and the U.S. Army Corps of Engineers will conduct a public meeting to receive public comment on the Draft EIS/EIR for this project on October 27, 2008 at the Crowne Plaza Hotel located at 601 S. Palos Verdes Street, San Pedro CA 90731. The deadline for written comments on the Draft EIS/EIR is December 8, 2008.

Related Posts:
Harbor Air Pollution Study Results

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Connecting to %s

Follow

Get every new post delivered to your Inbox.

Join 93 other followers